Location
65 Kleins Road, Northmead
Dates
June to September 2025
Work times
Weekdays 7 am to 5 pm
Noise levels
Medium. Potentially noise-generating works will be conducted between 9 am and 4 pm only.
What we will be doing
- Excavation and removal of concrete hardstand areas and underground sump.
- Excavation, classification, and transport of contaminated soil to a licensed waste facility.
- Levelling of excavation areas.
- Removal of asbestos-containing materials by a licenced asbestos removalist.
- Daily air monitoring tests to ensure standards are maintained.
When we will be working
The site remains fenced off and is not accessible to the general public.
Work will take place during standard construction hours, 7 am and 5 pm, Monday to Friday.
Potentially noise-generating works will be conducted between 9 am and 4 pm only.
What you can expect
- The health and safety of the community is our priority. To minimise the impact of works on the local community, noise, dust, and vibration will be kept to a minimum.
- The site will be remediated using methods proven to be environmentally safe, with clear standards to confirm the clean-up was effective.
- All legislative, local council, and SafeWork NSW requirements for the removal of asbestos-containing material will be met.
- An independent clearance certificate will be obtained to confirm completion of works.
We thank you for your patience and co-operation while we complete this important work.
Keeping up to date with our work
We will update this page as the project progresses.